Sample only. This matrix is for the fictional City of Riverbend RFP No. 2026-014 used in our city RFP sample.

Compliance Matrix: City of Riverbend RFP No. 2026-014

Prepared as part of a Bid / No-Bid & Compliance Check · Status as of the outline review

Before writing anything, we pull every requirement out of the solicitation: each "shall" and "must," every required form, and every evaluation factor. Each one gets a row, a place in the response, and an owner, so nothing slips through.

Submission requirements

IDRFP ref.RequirementTypeWhere answeredStatus
S-14.1Proposals due 2:00 p.m. local time on the due date, via the City's e-bid portalMustSubmission planConfirmed
S-24.2Technical volume no more than 20 pages, 11-point font minimumMustWhole volumeOn track (16 pages)
S-34.3Price on Price Form B only, uploaded as a separate fileMustPrice fileOwner: client
S-44.4Acknowledge all addendaMustCover letterDone (Addenda 1–2)
S-54.5Three references for similar work in the last five yearsMustSection 7, Attachment DDone
S-64.7Certificate of insurance meeting Exhibit E limitsMustAttachment EOwner: client (request from agent)
S-74.8Signed non-collusion affidavit (Form C)MustAttachment FOwner: client (signature)
S-84.9Offer valid for 120 daysMustCover letterDone

Scope requirements

IDRFP ref.RequirementTypeWhere answeredStatus
T-13.2Service each building on the schedule in Attachment AShallSections 2, 3.1Done
T-23.3Day porter at City Hall, 7:00 a.m.–3:30 p.m.ShallSection 4Done
T-33.4Named on-site supervisor reachable during service hoursShallSection 4Done
T-43.6Police Department background checks before accessShallSections 3.3, 4, 6Done
T-53.6Key and badge control; report lost keys immediatelyShallSection 3.3Done
T-63.8Green-certified products; SDS on siteShallSection 3.2Done
T-73.9Respond to urgent requests within 4 hoursShallSection 5 (we offer 2 hours)Done, exceeds
T-83.10Written quality control plan with inspectionsShallSection 5Done
T-93.11Transition plan; full service within 30 days of awardShallSection 6Done

Evaluation factors (RFP Section 5)

FactorPointsWhat the evaluators look forWhere we score it
Technical approach30Clear, complete task plan by buildingSections 2–3
Staffing and supervision20Enough staff, real supervision, backup coverageSection 4
Quality control15Measurable inspections and corrective actionSection 5
Past performance15Similar size and secure facilitiesSection 7
Price20Lowest responsive price gets full pointsPrice Form B (client)

Risks and questions flagged

Get a compliance check for your bid